How Cia Hering transformed PPC with Opcenter APS and NEO: 60% productivity gain with scheduling 10x more agile

Published on:
Share:
Share:

Discover how Cia Hering — one of Brazil's largest and most traditional fashion brands — digitized production planning and scheduling with Siemens Opcenter APS and NEO's expertise, reducing lead times, gaining efficiency, and strengthening its operation in the fast-paced fashion industry.

Talk to our experts

Read the full case now.

download (pt)download (en)
Relume Library
Relume Library
Relume Library
Relume Library
Relume Library
Relume Library
Relume Library
Relume Library
Relume Library
Relume Library
Relume Library
Relume Library
Relume Library
Relume Library
Relume Library
Relume Library

Real companies. Proven results.

63% reduction in production order generation time

Schedule preparation time dropped from 10 days to 1 day

Productivity per sewing workstation grew about 60%

24 percentage-point improvement in global service level

Testimonial:

We'll add new testimonials soon.

Want to read the full case?

Sign up to access our members-only area and download the e-book with the full case.
Read the full case now!
download (pt)download (en)