How does the simulation power of OPCENTER APS work?

Published on:
Published by:
Share:
How does the simulation power of OPCENTER APS work?

Production sequencing is an issue that has a direct impact on shop-floor productivity. However, PPCP teams often do not have the best scheduling tools available to simulate several production scenarios based on the industry's priorities. With non-specialized tools, a lot of energy and time is wasted building this kind of view; with the right software, you can simulate scenarios easily and produce schedules and re-schedules in just a few minutes, in an optimized way.OPCENTER APS (formerly known as Preactor) was created precisely to address this kind of issue. The video below shows, in a practical way, how to build three different scenarios for three different priorities, allowing you to compare each scenario to determine which is ideal for your goal: lower setup time, prioritizing customers, or due dates — ensuring that PPCP is always equipped with information and indicators to evaluate the schedule. Check out the video below![embed]https://youtu.be/a4IKKhQcfc0[/embed][noptin-form id=2822]

Share: