Integrated planning for the Metalworking industries

From demand forecasting to detailed scheduling and logistics, Neo connects the critical areas of the metalworking chain — from foundry and stamping to machining, treatment, welding and assembly — into orchestrated decisions through a complete, agentic Supply Chain Planning platform.

Schedule a Demo
SUPPLY CHAIN FOR METALWORKING

Long routings with dozens of operations, shared resources and tooling, and constant rescheduling make the metalworking chain one of the hardest to orchestrate.

Portfolios with thousands of SKUs, routings with 15 or more operations, ETO and make-to-order environments, shared resources and tooling, and complex setup matrices create a puzzle that spreadsheets and ERPs can no longer solve.

We combine sector experience and the robustness of Siemens solutions with the innovation of one of the fastest-growing Indtechs in the global Supply Chain Planning space.

Metalworking Clients: from S&OP to APS

Manufacturers of auto parts, metal components, fasteners, flat steel and equipment that chose Neo to orchestrate their production planning and/or detailed scheduling with S&OP and APS solutions.

Logo cliente 01Logo cliente 02Logo cliente 03Logo cliente 04Logo cliente 05Logo cliente 06Logo cliente 07Logo cliente 08Logo cliente 09Logo cliente 10Logo cliente 11Logo cliente 12Logo cliente 13Logo cliente 14Logo cliente 15Logo cliente 16Logo cliente 17Logo cliente 18Logo cliente 19
SUPPLY CHAIN MANAGEMENT FOR METALWORKING

From demand planning and S&OP to Detailed Scheduling and S&OE

Neo's solutions cover the most critical decisions in the metalworking chain, connecting demand, inventory, capacity and detailed scheduling in a continuous cycle.

Schedule a Demo
Icone Planejamento de Demanda NEO Digital Industries

Demand Forecasting (OEM and Aftermarket)

Statistical forecasting and commercial collaboration reconciling OEM production programs, aftermarket replacement demand and make-to-order items — handling seasonality, new launches, end-of-line items and thousands of SKUs with AI/ML methods.

Icone Saude dos Estoques NEO Digital Industries

Raw Material and Semi-finished Goods Inventory

Inventory and replenishment policies for steel, copper and aluminum, semi-finished and finished goods, with ABC/XYZ segmentation and coverage tailored to long routings and MTS/MTO environments — reducing WIP and tied-up capital.

Icone Planejamento de Distribuicao NEO Digital Industries

Multi-DC Distribution and Export

Distribution and transfer planning for multi-DC networks, OEM deliveries (line-side/JIT) and exports, with fair share and prioritization by order book and promised dates.

Icone Planejamento de Capacidade NEO Digital Industries

Finite Capacity and Shared Resources

S&OP and finite capacity at the sector's real bottlenecks — foundry, stamping, machining, heat treatment, welding, electroplating and painting — accounting for tooling, molds and dies, and labor shared across hundreds of resources.

Icone Programacao Fina de Producao NEO Digital Industries

Detailed Scheduling and Sequencing (APS)

Opcenter APS sequencing routings of 15+ operations with setup matrices (up to millions of combinations), synchronizing stages, batches and shared resources — reducing setups, queues, WIP and unproductive time.

Icone Torre de Controle NEO Digital Industries

Rescheduling and Control Tower

Fast, reliable rescheduling in response to machine breakdowns, rework, material delays and shifting commercial priorities, with scenario simulation, trustworthy promised dates and end-to-end shop-floor visibility.

What you can expect in Metalworking

Neo's experience with more than 120 projects, many of them publicly documented, is reflected in quantitative and qualitative results that help companies reach new levels of supply chain maturity. See some examples of what to expect for the sector:

Higher Service Level
Realistic plans connecting demand, finite capacity and materials raise customer service — Isolet raised its service level to over 80%.
Service level
>80%
Less Lead Time
Better synchronization between foundry, machining and assembly reduces queues and wait times — Cecal cut lead time by 38% with Opcenter APS.
Lead time
-38%
Less WIP
Sequencing with setup matrices and synchronization between operations reduces queues and work-in-process inventory — Isolet cut WIP by 34%.
WIP in process
-34%
Fewer Machine Stoppages
Better sequencing and line balancing reduce stoppages caused by excess finished goods — ArcelorMittal Gonvarri cut machine stoppages by 45% and inventory coverage by 14%.
Machine stoppages
-45%
CUSTOMER STORIES

ZEN: how one of Brazil's leading automotive component manufacturers cut scenario building from ~2 hours to ~10 minutes with Opcenter APS.

From tacit knowledge to a standardized, scalable, scenario-driven model

“Implementing Opcenter APS represented a structural shift in how ZEN plans and schedules its production. We moved from a model dependent on individual knowledge to a much more robust, reliable and sustainable process, with clear gains in scheduling predictability and quality.” — Gabriel Darosci, Planning Supervisor

Case ZEN · Opcenter APS + NEO Digital Industries

Results

+10% production volume • -15% setup time • Scheduling from ~2h to ~10 min • Setup matrix with +4 million combinations

Read the full case study

Contact us and discover how
we can help your industry:

Thank you! Your message has been successfully received!
Oops! There was an error submitting the form. Please try again.
×

Get in touch and schedule your assessment and demo

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Thank you! We'll be in touch shortly.
Oops, something went wrong. Please try again.
×

Download the Incepa Case Study

Fill in your details to receive the PDF.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Thank you! The PDF download should start automatically.
Oops, something went wrong. Please try again.